IPM Calendar 
Friday 19 April 2024   Today  
Events for day: Monday 06 August 2018    
           11:00 - 12:00     Experimental Journal Club
RPC Upgrade Phase-II, New RPC Link Board System and Back-end electronics(part I)

School
PARTICLES AND ACCELERATORS

During the HL-LHC operation, the expected conditions in terms of background and pile-up and the probable aging of the present detectors will make the muon identification and correct pT assignment a challenge for the muon system. In order to ensure redundancy of the muon system also under the HL-LHC conditions, the present RPC system has to be improved. The RPC Data taking system and specially Link board system is one of the most important part of this improvement. After Muon hits, the data from the RPC chambers and their front-end boards are sent to trigger and readout via a link board system.
The current link board system is made of e ...